2.5 hours
Saturday, July 9, 2011
Panel Cut Out and Fitted
Wednesday, July 6, 2011
Side Decks Sanded and Epoxied Again
Tuesday, July 5, 2011
Side Decks Taped
Also filled the holes on the interior right side and left side where the screws held the side decks into place. They will be sanded down and then the entire interior epoxied one more time before sanding and painting.
3.0 hours
Sunday, July 3, 2011
Cabin Top Sanded and Cabin Exterior Epoxied/Right Side Deck Installed
Friday, July 1, 2011
Cabin Top Fiberglassed
Tuesday, June 28, 2011
Cabin Top Screw Holes Filled/Transom Final Shape
I also removed all of the screws in the cabin top and filled each one with non-thickened epoxy using a toothpick and then put a portion of a toothpick that was cut to size for each hole inside the hole. I let that set for about an hour then filled the top with thickened epoxy using wood flour.
3 hours
Monday, June 27, 2011
Cabin Top Epoxied/Side Decks Final Fitted/Transom Cut Out
5.5 hours
Sunday, June 26, 2011
Fiberglass Seams Sanded/Cabin Top Trimmed
Friday, June 17, 2011
Cabin Top Fitted
Subscribe to:
Posts (Atom)